Tuesday, January 15, 2008

Paul's quality of work at home.

These are only samples of unfinished work he left.
There was also: An unleveled room, windows that leaked air, a wall that leaked water, unfinished soffit on the outside of the house, a huge hole he cut in the eve and left open where the squirrels found their way in and tried to dig through the ceiling, a garbage disposal that leaked, toilets that rocked and the list goes on.
The bathroom in these photos was never completed, the tile was uneven and jagged, the shower had a pan leak, the tile floor he installed was also uneven and some of the tiles had come loose, the kitchen in these photos had gone unfinished for FOUR years.
When this house was finally sold....it was sold "As is" and at a huge discount from market value because of the sheer amounts of work that had to be done.

No comments: